
- info@hlhproto.com
- +86-731-8223-4949
- Room 1231, Wanjiali International Mall, Wanjiali Middle Road No.99, Furong District,Changsha,Hunan province,China,410016
PRODUCTION




Validating a product with 3D-printed or machined prototypes is only half the battle; true manufacturing readiness requires testing parts molded from actual production-grade thermoplastics. Our rapid injection molding service uses fast-turnaround bridge tooling to deliver 100 to 100,000+ end-use parts in weeks rather than months.
Unlike traditional Class-101 hardened steel production molds that take 8–12 weeks to build, rapid tooling utilizes high-grade aluminum or pre-hardened steel (such as P20 or NAK80) machined via high-speed CNC and EDM.
Speed to Market: Tooling is completed in as little as 10–15 days, allowing you to launch pilot runs while high-volume export tooling is still being built.
True Production Resins: Mold parts using genuine SABIC, DuPont, or BASF resins (ABS, PC, PA66+GF, POM, TPE) to validate shrinkage, warpage, and regulatory compliance (e.g., UL94 flame ratings or FDA medical grades).
Overmolding: Combines a rigid plastic substrate with a soft-touch TPE/TPU grip in a two-step molding process—essential for handheld electronics, power tools, and medical devices.
Insert Molding: Encapsulates threaded brass inserts, stainless steel pins, or electronic contacts directly inside the molten plastic, eliminating post-molding assembly labor.
Draft angles (typically 1°–2°), uniform wall thickness, and strategic gate placement prevent sink marks and ejection drag. Be sure to consult our 10 DFM Tips (Article 9) and download our Low Volume Manufacturing Whitepaper before finalizing your mold design.